
Palma del Río – Andalucía (Spain) – Hybrid System = PAT + PV
- Micro Hydro – PAT:
– Installed as a by pass (DN250)
– Within the valve chamber
– Operational conditions
– P=20 mca
– Q=0.01 m3/s
– P ~ 1,5 kW
– Anual production: 3.2 MWh - Photovoltaic Central – PV:
– Installed on the roof top of the chambre
– 2 pannels
– P=0.6 kW
– Anual production : 1.1 MWh


