Your Micro Hydro – Viability Study, V.S.
Cost
– installed power up to 20 kW – 380 €
- installed power > 20 kW - to be analysed
Service includes:
- scheme of Hydraulic Circuit of installation;
- location of MH;
- identification of installed power;
- identification of local of consumption;
- construction budget estimation
